Main installation methods of steel sheet piles:
Pit digging installation method:
1. Preliminary preparation
Before digging the installation pit, it is necessary to carefully check the site environment, determine the construction safety area, and mark the outline of the installation pit on the ground.
2. Digging the installation pit
According to the design plan, dig a pit that meets the length and width requirements of the steel sheet piles, smooth the bottom and do a good job of drainage.
3. Installing steel sheet piles
Gently tilt the steel sheet piles into the pit so that the bottom and the notch are flush with the ground. The vibrating hammer gradually drives the steel sheet piles into the ground until it reaches the designed depth. Repeat the above operations until all the steel sheet piles are installed.
4. Subsequent work
After all the steel sheet piles are installed, the pile tops need to be trimmed and rust-proofed as needed.
Dump truck installation method:
1. Preliminary preparation
Similar to the pit digging installation method, it is necessary to carefully check the site environment and determine the construction safety area. It is also necessary to park the dump truck in a safe area and place the steel sheet piles on the truck.
2. Installing steel sheet piles
Start the dump truck and let the steel sheet piles gradually tilt downward. During the tilting process, use a vibrating hammer to gradually drive the steel sheet piles into the ground until they reach the designed depth. Adjust the position of the dump truck appropriately and repeat the above operations until all the steel sheet piles are installed.
3. Subsequent work
After all the steel sheet piles are installed, the pile tops need to be trimmed and rust-proofed as needed.
Installation by drilling method:
1. Preliminary preparation
Determine the construction area, drill holes on the ground that match the steel sheet piles, and reinforce the holes. At the same time, prepare the drilling equipment and the steel sheet piles to be installed.
2. Set up the drilling rig
Set the drilling rig on the hole and adjust the angle and excavation direction as needed. Drill according to the design plan until the designed depth is reached.
3. Installing steel sheet piles
Use a vibrating hammer to gradually drive the steel sheet piles into the ground until they reach the designed depth. Repeat the above operations until all the steel sheet piles are installed.
4. Subsequent work
After all the steel sheet piles are installed, the pile tops need to be trimmed and anti-rust treatment is performed as needed.
In short, during the installation of steel sheet piles, attention should be paid to construction details, such as selecting steel sheet piles according to the designed depth and length, keeping the construction area dry and tidy, using tools such as vibrating hammers reasonably, and discharging groundwater in time. Only by paying attention to safety and details can the installation of steel sheet piles be successfully completed.
Pit digging installation method:
1. Preliminary preparation
Before digging the installation pit, it is necessary to carefully check the site environment, determine the construction safety area, and mark the outline of the installation pit on the ground.
2. Digging the installation pit
According to the design plan, dig a pit that meets the length and width requirements of the steel sheet piles, smooth the bottom and do a good job of drainage.
3. Installing steel sheet piles
Gently tilt the steel sheet piles into the pit so that the bottom and the notch are flush with the ground. The vibrating hammer gradually drives the steel sheet piles into the ground until it reaches the designed depth. Repeat the above operations until all the steel sheet piles are installed.
4. Subsequent work
After all the steel sheet piles are installed, the pile tops need to be trimmed and rust-proofed as needed.
Dump truck installation method:
1. Preliminary preparation
Similar to the pit digging installation method, it is necessary to carefully check the site environment and determine the construction safety area. It is also necessary to park the dump truck in a safe area and place the steel sheet piles on the truck.
2. Installing steel sheet piles
Start the dump truck and let the steel sheet piles gradually tilt downward. During the tilting process, use a vibrating hammer to gradually drive the steel sheet piles into the ground until they reach the designed depth. Adjust the position of the dump truck appropriately and repeat the above operations until all the steel sheet piles are installed.
3. Subsequent work
After all the steel sheet piles are installed, the pile tops need to be trimmed and rust-proofed as needed.
Installation by drilling method:
1. Preliminary preparation
Determine the construction area, drill holes on the ground that match the steel sheet piles, and reinforce the holes. At the same time, prepare the drilling equipment and the steel sheet piles to be installed.
2. Set up the drilling rig
Set the drilling rig on the hole and adjust the angle and excavation direction as needed. Drill according to the design plan until the designed depth is reached.
3. Installing steel sheet piles
Use a vibrating hammer to gradually drive the steel sheet piles into the ground until they reach the designed depth. Repeat the above operations until all the steel sheet piles are installed.
4. Subsequent work
After all the steel sheet piles are installed, the pile tops need to be trimmed and anti-rust treatment is performed as needed.
In short, during the installation of steel sheet piles, attention should be paid to construction details, such as selecting steel sheet piles according to the designed depth and length, keeping the construction area dry and tidy, using tools such as vibrating hammers reasonably, and discharging groundwater in time. Only by paying attention to safety and details can the installation of steel sheet piles be successfully completed.